17602Permits
1420 Turk St
Address
142
Units
Apr 27, 2018
Filed
Additions
unit t3-403 r&r kitchen and bathroom cpuntertops, sinks ans p-traps (maintain same height and clearance if accessible unit) r&r switches, outlets and light fixtures. lighting shall be high eff.
View details
1550 Eddy St
Address
103
Units
Apr 27, 2018
Filed
Additions
unit s2-501 r&r kitchen and bathroom cpuntertops, sinks ans p-traps (maintain same height and clearance if accessible unit) r&r switches, outlets and light fixtures. lighting shall be high eff.
View details
88 Townsend St
Address
112
Units
0 day
Approval time
Apr 27, 2018
Issued
Additions
t24 lighting ref 201801310079
View details
345 California St
Address
161
Units
Apr 27, 2018
Filed
Additions
electrical - lighting and control switch ref pa 2018-0326-4557 and 2018-0223-2072
View details
350 Turk St
Address
362
Units
0 day
Approval time
Apr 27, 2018
Issued
Additions
to obtain final inspection for work approved under pa#201405024802. all work is complete.
View details
1755 Ofarrell St
Address
190
Units
Apr 27, 2018
Filed
Additions
r&r kitchen and bathroom cpuntertops, sinks ans p-traps (maintain same height and clearance if accessible unit) r&r switches, outlets and light fixtures. lighting shall be high eff.
View details
219 Brannan St
Address
130
Units
0 day
Approval time
Apr 27, 2018
Issued
Additions
remodel 2 bathrooms & kitchen in-kind. replace sheetrock as needed, new floors throughout. all work remodel in-kind. n/a for maher.
View details
121 Spear St
Address
320
Units
Apr 27, 2018
Filed
Additions
suite b7: revision to 201803234417 mechanical - includes hood supply air plenum maher na
View details
455 Eddy St
Address
362
Units
0 day
Approval time
Apr 27, 2018
Issued
Additions
to obtain final inspection for work approved under pa#201405024803. all work is complete.
View details
1730 Ofarrell St
Address
135
Units
Apr 27, 2018
Filed
Additions
unit m1-705 r&r kitchen and bathroom cpuntertops, sinks ans p-traps (maintain same height and clearance if accessible unit) r&r switches, outlets and light fixtures. lighting shall be high eff.
View details
1420 Turk St
Address
142
Units
Apr 27, 2018
Filed
Additions
unit t3-1210 r&r kitchen and bathroom cpuntertops, sinks ans p-traps (maintain same height and clearance if accessible unit) r&r switches, outlets and light fixtures. lighting shall be high eff.
View details
1730 Ofarrell St
Address
135
Units
Apr 27, 2018
Filed
Additions
unit m1-604 r&r kitchen and bathroom cpuntertops, sinks ans p-traps (maintain same height and clearance if accessible unit) r&r switches, outlets and light fixtures. lighting shall be high eff.
View details
1510 Eddy St
Address
191
Units
Apr 27, 2018
Filed
Additions
unit t2-1410 r&r kitchen and bathroom cpuntertops, sinks ans p-traps (maintain same height and clearance if accessible unit) r&r switches, outlets and light fixtures. lighting shall be high eff.
View details
1140 Harrison St
Address
371
Units
Apr 27, 2018
Filed
New construction
erect (n) 7-story mixed-use building
View details
1 Daniel Burnham Ct
Address
239
Units
0 day
Approval time
Apr 27, 2018
Issued
Additions
work in unit #219: bathroom remodel, new complaint toilet and lighting in same location. no new wall and no existing wall relocation. lighting shall comply with cec 150.0(k)5.
View details
111 Chestnut St
Address
102
Units
0 day
Approval time
Apr 26, 2018
Issued
Additions
unit #901: bathroom remodel - new tile floor, tiles in shower, replace existing lights, change sink/countertop
View details
219 Brannan St
Address
130
Units
Apr 26, 2018
Filed
Additions
remodel of existing single level residence on 4th fl of high rise building. work to include dmeo of non-structural partitions, new finishes & replacement of plumbing and lighting fixtures. no work visible from st. no sprinkler or fire alarm work. no structural work. maher na
View details
1500 Mission St
Address
550
Units
0 day
Approval time
Apr 25, 2018
Issued
Additions
install (1) new 4-inch fire service line off of 12-inch main on mission st into existing historic coca cola building. above ground sprinkler system under separate application. ref pa 2016-0620-0387s. n/a for maher.
View details
355 Buena Vista East Av
Address
101
Units
0 day
Approval time
Apr 25, 2018
Issued
Additions
unit #511 - kitchen cabinet replacement & bath remodel (no change of existing floor plan)
View details
625 Gilman Av
Address
156
Units
Apr 25, 2018
Filed
New construction
erect a new affordable housing with 156 units,ground fl retail,mixed-use residential,no basement, 6 story building. type 1a/3a. (r-2m) **comply w/ maher 155-13**
View details
338 Grant Av
Address
145
Units
Apr 25, 2018
Filed
Additions
ti of an (e) retail space to build gelato store with all associated mep's. ti to include new accessible restroom & demo of an (e) service mezzanine
View details
1066 Market St
Address
303
Units
Apr 25, 2018
Filed
Additions, Alteration or Repair
revision to issued addendum 1 for pa #2014-0612-8212 s. revise soldier pile layout at and near line 3, and add a bottom row of temporary tiebacks at soldier piles at golden gate avenue and the north end of jones st.
View details
125 Cambon Dr
Address
153
Units
Apr 24, 2018
Filed
Additions
comply with nov 201707181, install doors minor interior finish, repair and 4 new fire doors. ul 90. # 7h, 7m, 7g, 7l apartment doors. not visible from street.
View details
765 Market St
Address
139
Units
Apr 24, 2018
Filed
Additions
revision to 201704214531. changes to interior layout. replace won door system with rated enclosure for occupancy separation
View details
1625 Post St
Address
208
Units
0 day
Approval time
Apr 24, 2018
Issued
Additions
to obtain final inspection for work approved under pa# 201502107914, 201409045412, 200708079001 all work is complete.
View details
1625 Post St
Address
208
Units
0 day
Approval time
Apr 24, 2018
Issued
Additions
to obtain final inspection for work approved under pa# 200709172875, 200602225129, 200504190330all work is complete.
View details
1625 Post St
Address
208
Units
0 day
Approval time
Apr 24, 2018
Issued
Additions
to obtain final inspection for work approved under pa# 200007124927, 9714503, 9501202 all work is complete.
View details
1200 04th St
Address
174
Units
0 day
Approval time
Apr 24, 2018
Issued
Additions
perform water testing investigation at 5 locations throughout complex. perform stucco and concrete opening of approx 3x3 ea. repairs to be made in kind
View details
1208 19th St
Address
139
Units
Apr 24, 2018
Filed
Additions
View details
1625 Post St
Address
208
Units
0 day
Approval time
Apr 24, 2018
Issued
Additions
to obtain final inspection for work approved under pa# 8814154, 8907134, 8411790 all work is complete.
View details
1625 Post St
Address
208
Units
0 day
Approval time
Apr 24, 2018
Issued
Additions
to obtain final inspection for work approved under pa# 201205291395, 200910078509, 200710185800 all work is complete.
View details
601 Van Ness Av
Address
449
Units
1 day
Approval time
Apr 25, 2018
Issued
Additions
unit #148: bathroom remodel. remove & replace tile, vanity sink. remove tub and convert to shower, replace toilet. new led lights, new fan. no structural work. replace in kind. maher n/a. provide vacancy sensor.
View details
1625 Post St
Address
208
Units
0 day
Approval time
Apr 24, 2018
Issued
Additions
to obtain final inspection for work approved under pa# 200104136859, 200003255385, 200010183391 all work is complete.note 200003055385 has 4 special inspections
View details
1390 Market St
Address
444
Units
0 day
Approval time
Apr 23, 2018
Issued
Additions
#2516 kitchen and bath remodel. no structural or walls
View details
260 King St
Address
304
Units
Apr 23, 2018
Filed
Additions
View details
761 Post St
Address
150
Units
Apr 23, 2018
Filed
Additions
revision to 201711274834: remove the replacement of (e) alum sash slider windows at south elevation from scope of work.
View details
855 Folsom St
Address
187
Units
0 day
Approval time
Apr 23, 2018
Issued
Additions
unit 527: replace kitchen cabinet, new electrical lighting, kitchen remodel - no walls changed. maher ord 155-13 na
View details
838 Pacific Av
Address
194
Units
7 days
Approval time
Apr 27, 2018
Issued
Additions
revision to app#201510190132 to add non-structural aluminum awning at front facade. n/a for maher
View details
100 Van Ness Av
Address
418
Units
Apr 20, 2018
Filed
Additions, Alteration or Repair
convert existing garage entry at ground fl, continuing existing storefront over garage opening for further retail package room expansion and bicycle storage use. provide new openings at ground level for future connection to 150 van ness
View details
855 Brannan St
Address
434
Units
0 day
Approval time
Apr 19, 2018
Issued
Additions
ste b3: ti of an (e) fci s3 fa panel. (1) supply fan requiring detection and control for shut down. new a/v's in common area of ti space. existing h/s relocated in ti space. monitoring of a new kitchen hood ansul system. (1) strove in common areas & h/s in common area of ti space. ref #201709077298.
View details
1400 Geary Bl
Address
297
Units
5 days
Approval time
Apr 24, 2018
Issued
Additions
7th fl unit 7d interior remodel, replace plumbing fixtures. install shower grab bar backing. add local smoke detector at sleeping room and living rm entry area, no exterior work
View details
691 China Basin St
Address
152
Units
Apr 19, 2018
Filed
New construction
erect a new r-2,e,b 7 stories with 152 dwelling unit, no basement. residential,child developement center and art activity space. type 1a,iii,va
View details
626 Mission Bay Blvd North Bl
Address
143
Units
Apr 19, 2018
Filed
Additions
revision to permit #201507272485s2/r4 - clarification of the removal of all passive roof vents at roof assembly 'f04' in floor plan view, to reflect what was agreed pre-appl. minutes on sheet go24 (change from ventilated va roof assembly to unvented assembly, to maintain fire rating of roof).
View details
145 Guerrero St
Address
110
Units
Apr 19, 2018
Filed
Additions, Alteration or Repair
installation of errcs emergency responder radio coverage system ref 201512285978
View details
75 Yerba Buena Ln
Address
1500
Units
Apr 18, 2018
Filed
Additions
revision to 201703201819. existing tropisueno restaurant expanding into vacant space & providing take out concept w/new cold-prep kitchen area & service counters with associted electrical, mechanical & plumbing. maher na
View details
140 South Van Ness Av
Address
212
Units
0 day
Approval time
Apr 18, 2018
Issued
Additions
kitchen remodel in kind 10x10
View details
121 Spear St
Address
320
Units
7 days
Approval time
Apr 25, 2018
Issued
Additions
3rd flr - health department food service drawings assoicated with approved arch and mep. ref 201711093681
View details
461 02nd St
Address
127
Units
0 day
Approval time
Apr 18, 2018
Issued
Additions
#129c: t.i. for fire sprinkler to relocate 6 heads. ref app#201708114669 n/a for maher
View details
71 03rd St
Address
486
Units
Apr 17, 2018
Filed
Additions
new canopy, awning, exterior planters, railing and seating. ref app#201710040347. n/a for maher
View details
74 06th St
Address
188
Units
0 day
Approval time
Apr 17, 2018
Issued
Additions
4th and 5th flr. remove and replace all tile and sheetrock from shower stall walls, replace 1 electrical switch, install new hardieback board waterproof shower stall with shower pan test. install new tile at 4th and 5th floor shower area.
View details