unit t3-403 r&r kitchen and bathroom cpuntertops, sinks ans p-traps (maintain same height and clearance if accessible unit) r&r switches, outlets and light fixtures. lighting shall be high eff.
unit s2-501 r&r kitchen and bathroom cpuntertops, sinks ans p-traps (maintain same height and clearance if accessible unit) r&r switches, outlets and light fixtures. lighting shall be high eff.
r&r kitchen and bathroom cpuntertops, sinks ans p-traps (maintain same height and clearance if accessible unit) r&r switches, outlets and light fixtures. lighting shall be high eff.
unit m1-705 r&r kitchen and bathroom cpuntertops, sinks ans p-traps (maintain same height and clearance if accessible unit) r&r switches, outlets and light fixtures. lighting shall be high eff.
unit t3-1210 r&r kitchen and bathroom cpuntertops, sinks ans p-traps (maintain same height and clearance if accessible unit) r&r switches, outlets and light fixtures. lighting shall be high eff.
unit m1-604 r&r kitchen and bathroom cpuntertops, sinks ans p-traps (maintain same height and clearance if accessible unit) r&r switches, outlets and light fixtures. lighting shall be high eff.
unit t2-1410 r&r kitchen and bathroom cpuntertops, sinks ans p-traps (maintain same height and clearance if accessible unit) r&r switches, outlets and light fixtures. lighting shall be high eff.
work in unit #219: bathroom remodel, new complaint toilet and lighting in same location. no new wall and no existing wall relocation. lighting shall comply with cec 150.0(k)5.
remodel of existing single level residence on 4th fl of high rise building. work to include dmeo of non-structural partitions, new finishes & replacement of plumbing and lighting fixtures. no work visible from st. no sprinkler or fire alarm work. no structural work. maher na
install (1) new 4-inch fire service line off of 12-inch main on mission st into existing historic coca cola building. above ground sprinkler system under separate application. ref pa 2016-0620-0387s. n/a for maher.
erect a new affordable housing with 156 units,ground fl retail,mixed-use residential,no basement, 6 story building. type 1a/3a. (r-2m) **comply w/ maher 155-13**
revision to issued addendum 1 for pa #2014-0612-8212 s. revise soldier pile layout at and near line 3, and add a bottom row of temporary tiebacks at soldier piles at golden gate avenue and the north end of jones st.
comply with nov 201707181, install doors minor interior finish, repair and 4 new fire doors. ul 90. # 7h, 7m, 7g, 7l apartment doors. not visible from street.
perform water testing investigation at 5 locations throughout complex. perform stucco and concrete opening of approx 3x3 ea. repairs to be made in kind
unit #148: bathroom remodel. remove & replace tile, vanity sink. remove tub and convert to shower, replace toilet. new led lights, new fan. no structural work. replace in kind. maher n/a. provide vacancy sensor.
to obtain final inspection for work approved under pa# 200104136859, 200003255385, 200010183391 all work is complete.note 200003055385 has 4 special inspections
convert existing garage entry at ground fl, continuing existing storefront over garage opening for further retail package room expansion and bicycle storage use. provide new openings at ground level for future connection to 150 van ness
ste b3: ti of an (e) fci s3 fa panel. (1) supply fan requiring detection and control for shut down. new a/v's in common area of ti space. existing h/s relocated in ti space. monitoring of a new kitchen hood ansul system. (1) strove in common areas & h/s in common area of ti space. ref #201709077298.
7th fl unit 7d interior remodel, replace plumbing fixtures. install shower grab bar backing. add local smoke detector at sleeping room and living rm entry area, no exterior work
revision to permit #201507272485s2/r4 - clarification of the removal of all passive roof vents at roof assembly 'f04' in floor plan view, to reflect what was agreed pre-appl. minutes on sheet go24 (change from ventilated va roof assembly to unvented assembly, to maintain fire rating of roof).
revision to 201703201819. existing tropisueno restaurant expanding into vacant space & providing take out concept w/new cold-prep kitchen area & service counters with associted electrical, mechanical & plumbing. maher na
4th and 5th flr. remove and replace all tile and sheetrock from shower stall walls, replace 1 electrical switch, install new hardieback board waterproof shower stall with shower pan test. install new tile at 4th and 5th floor shower area.